LIQUIDS RECOVERY PROJECTS

Devon Canada Corp (formerly Anderson) - West Culp

  • Design and project management of a 20 MMSCFD sour gas plant including 125 USGPM amine sweetening, 350 HP refrigeration, LPG production, oil battery modifications, solution gas compression, 3000 HP primary gas compression, 250 HP acid gas injection and power generation.
  • AENV permit application.
  • AEUB permit application and audit manual.
  • Acid gas rate: 2190 lb/hr. Acid gas composition: 53% H2S, 45% CO2. Acid gas compression: 250 HP at 1220 psig. Wellhead pressure 800 psi.

Mazeppa Processing Partnership - Mazeppa

  • Design and project management for the addition of 45 MMSCFD processing capacity including expansion to inlet separation, fractionation, refrigeration and product storage.
  • Extensive control systems modification to implement an integrated DCS system.

Polish Oil and Gas Company - Debno, Poland

  • Design basis memorandum and project specifications for a 45 MMSCFD sour gas plant including fractionation and sulphur plants. Economic evaluation of 200 cum/d fractionation train options.
  • Project management of a US $70 million gas plant development involving 21 wells and the production of 45 MMSCFD gas, 6000 bbl/d oil, 120 t/d sulphur, 600 bbl/d LPG and 200 bbl/d condensate.
  • Fabrication and construction inspection.
  • Pipeline system design and evaluation.
  • HAZOP evaluation. Start-up and operations support.
  • Training - plant management and Debno Plant Operations personnel.

Texaco Canada - Alberta HUB

  • Design and project management of an underground gas storage plant capacity increase from 250 MMSCFD to 500 MMSCFD.
  • Installation of 9 km of 16" pipeline and tie-in of two storage wells.
  • Addition of inlet separation and 3335 HP compression.
  • Executed heat and material balance for 400 MMSCFD hydrocarbon dewpoint control unit. P&ID development. Equipment Specification. Supervised assembly of components onto one skid.